Welcome toChina Architecture Design Net
Add to Favorites | Chinese
Position:home>Building codes>
The country builds award of project Lu Ban (the country actors or actress) selec
From;    Author:Stand originally

Project of the 5th chapter checks
Classics of the seventeenth project be commendatoried undertakes the spot checks after first trial is eligible. According to project category and amount, organization a certain number of check group. Check the group is comprised by person of 4-5 of professional technology personnel, place of the project that be checked belongs to area bldg. association or 1 person cooperates select of sectional construction association the job.
The content that the 18th project checks and requirement:
(one) listen to bear build an unit to introduce to the circumstance of engineering construction and quality. Basically introduce project characteristic, difficulty, construction technology and quality assure measure, each branch divides a project quality standard and quality assess result.
(2) check project quality standard on the spot. Always check the project content that the group asks to examine and place, must give contented, must not with any reason evasive or refuse.
(3) listen to use unit to be opposite the evaluation opinion of project quality. Check when group and use unit have an informal discussion, main bear the concerned staff that builds unit and main ginseng to build an unit ought to evasive.
(4) consult the project concerns inside trade data:
1. project approving examines and approve a data, include report of project project approving, about sectional examination newspaper of file, project builds file of give an official to wait (afore-mentioned data should be original) ;
2. all technology and quality data;
3. manages a material entirely.
In concerned technology, quality and administrative data, according to concerned regulation, should be original must offer original.
(5) check the concerned circumstance that the group checks to the project undertakes spot comment and appraise.
(6) check the group is referred to evaluation committee written check report.
Project of the 6th chapter is evaluated
The evaluation job of award of the 19th Lu Ban is undertaken by evaluation committee. Evaluation committee is comprised by 21 people, set chairman committee member 1 person, 2 people of vice director committee member, 18 people of commissarial. Evaluating a committee member must be to have technology of major of advanced technology title, familiar project, had held the position of the expert of certain and professional technical position.
Committee member of the 20th evaluation builds association foundation by area bldg. association and branch commissioner condition, recommend to Chinese bldg. association, decide by Chinese bldg. association.
The member that evaluates committee adopts fixed rotate to make. Adjust 3 every years, adjust every time 1/3 the left and right sides.
Job of the 21st evaluation holds to strict, serious, just, fair job principle. Evaluation conference must attend by evaluation him committee member, do not attend so that accreditation represents.
Basis of committee of the 22nd evaluation is recommended of the project declare data and project to check the report of the group, through examining, watch project kinescope, inquiry, discuss, appraise sth through discussion, define engineering of bear the palm finally with secret ballot means.
Previous 1 2 3 4 56 Next
About us | Legal Notices | Sitemap | Links | Partner